Aiming at the problem of output fluctuation of PV power station and the changeable situation of inflow interval of cascade hydropower stations
in order to cope with the uncertainty of photovoltaic power
this study considers the coordination relationship between PV units and hydropower units under the uncertainty of incoming water
and proposes an optimal scheduling model of cascade hydropower stations considering uncertainty of incoming water. Firstly
by analyzing the historical measured interval incoming water of cascade hydropower stations and the solar irradiance of PV power stations
based on the improved -means clustering method
the typical scenarios of incoming water and PV uncertainty are established. Then
considering the power generation income and the penalty cost of power abandonment
the optimal scheduling model of cascade hydropower stations considering uncertainty of incoming water is proposed with the goal of maximizing the total operating income of cascade hydropower stations. Finally
the simulation results show that the optimal scheduling model of cascade hydropower stations proposed in this study can fully coordinate the schedulable resources
reduce the rate of water and light abandonment
and improve the overall operation economy of cascade hydropower stations.