1. 清华大学-中国长江三峡集团有限公司气候变化治理机制与绿色低碳转型战略联合研究中心,北京,100000
2. 中国长江三峡集团有限公司 国际清洁能源研究室,北京,100000
4. 清华大学 电机工程与应用电子技术系,北京,100000
6. 清华大学 能源环境经济研究所,北京,100000
8. 清华大学 气候变化与可持续发展研究院,北京,100000
纸质出版:2023
移动端阅览
王新宇, 卢韦伟, 石睿杰, 等. 三峡集团乌兰察布“源网荷储一体化”示范项目设计[J]. 电力需求侧管理, 2023,25(4).
王新宇, 卢韦伟, 石睿杰, et al. Design of China Three Gorges corporation-Ulanqab“source-grid-loadstorage integration”demonstration project[J]. 2023, 25(4).
王新宇, 卢韦伟, 石睿杰, 等. 三峡集团乌兰察布“源网荷储一体化”示范项目设计[J]. 电力需求侧管理, 2023,25(4). DOI: 10.3969/j.issn.1009-1831.2023.04.007.
王新宇, 卢韦伟, 石睿杰, et al. Design of China Three Gorges corporation-Ulanqab“source-grid-loadstorage integration”demonstration project[J]. 2023, 25(4). DOI: 10.3969/j.issn.1009-1831.2023.04.007.
源网荷储一体化对助力实现碳达峰、碳中和目标、推动电力系统绿色低碳转型有重要的意义。以示范项目的核心子项目——新一代电网友好绿色电站示范项目为案例,综述“源网荷储一体化”项目的设计思路。该项目通过储能规模配置及一体化智慧调控两方面的设计实现对电网友好的功能。在储能配置方面,采用先进电池储能系统支撑储能技术转化应用和规模化发展;在智慧调控方面,针对常规新能源电站发电出力的随机性波动性问题,设计了不同集中调度运行模式。目前新一代电网友好绿色电站示范项目首批机组成功并网并仍在积极建设中。该项目将对保证电力系统安全稳定运行、探索新能源开发建设新模式、开展规模化储能科技创新等将具有重要示范意义。
Integration of power generation
transmission
distribution
consumption
and energy storage is crucial in facilitating the goals of carbon peaking and carbon neutrality and promoting the green and low-carbon transformation of the power system. The core sub-project of the Ulanqab demonstration project
new-generation grid-friendly green power station demonstration project
is taken as a case study to provide an overview of the design concept of source- grid- load- storage integration project. The demonstration project achieves grid- friendly functionality through the design of large-scale equipped storage and integrated intelligent regulation and control. In terms of energy storage
the project adopts lithiumion battery energy storage systems to support the transformation and application of energy storage technologies and their large-scale development. In terms of intelligent control
the project designs different centralized dispatch and operation modes to address the randomness and fluctuation issues of conventional renewable energy power plants. The first units of the demonstration project had successfully integrated into the grid
and the project is still under active construction. The project will have demonstration significance in ensuring the safe and stable operation of the power system
exploring new models for the development of renewable energy
and conducting large-scale energy storage technology innovation.