Growing with the development of the county micro grid scale
there is a micro network operating expenses cost and distributed renewable energy cannot be given rate at the same time and optimal problem
a day operators spending cost minimum and maximum double objective function of photovoltaic given rate are established
and power balance
power range and other constraints
micro grid optimal operation model are established. The multi- objective particle swarm optimization is introduced to solve the two-objective problem. Finally
taking the predicted data of total electricity load and PV of an industrial park as an example
the results are compared with the optimization results of standard particle swarm optimation under single objective to verify the effectiveness of the proposed model and algorithm.