1. 华中科技大学 能源与动力工程学院,武汉,430074
2. 南瑞武汉电气设备与工程能效测评中心,武汉,430074
3. 国网湖北节能服务有限公司,武汉,430074
纸质出版:2017
移动端阅览
罗莉莉, 邱泽晶, 陈焕新, 等. 基于SVR模型的湖北省“十三五”期间电能需求预测[J]. 电力需求侧管理, 2017,19(3).
罗莉莉, 邱泽晶, 陈焕新, et al. Forecast of electric power demand in Hubei province based on SVR model during the period of 2016—2010[J]. 2017, 19(3).
罗莉莉, 邱泽晶, 陈焕新, 等. 基于SVR模型的湖北省“十三五”期间电能需求预测[J]. 电力需求侧管理, 2017,19(3). DOI: 10.3969/j.issn.1009-1831.2017.03.007.
罗莉莉, 邱泽晶, 陈焕新, et al. Forecast of electric power demand in Hubei province based on SVR model during the period of 2016—2010[J]. 2017, 19(3). DOI: 10.3969/j.issn.1009-1831.2017.03.007.
政府大力推行电能替代的背景下,湖北省“十三五”期间对电量的需求量将会增加。结合电能消耗影响因素,应用SVR模型对湖北省“十三五”期间电能消耗量进行预测。预测结果表明,“十三五期间”,湖北省电能消耗量将稳步上升,电能替代工作有较大发展空间。
Under the background that the government vigorously promotes power replacement
the electricity demand of Hubei province during the period of 2016-2020 will increase
which this essay forecasts based on SVR model combined with power consumption impact factors.Forecast results show that
during the period of 2016-2020
the electricity consumption in Hubei province will increase steadily and the power replacement work has a larger development space.
0
浏览量
下载量
CSCD
关联资源
相关文章
相关作者
相关机构