Central air-conditioning load of public buildings has become one of the most important peak load shifting resources by electric power company
for the features of using time concentration
large capacity
various adjustable methods and little influence on customer
and so on.The compose of central air-conditioning power comsumption is analyzed firstly
and the adjustable stragies and effect of public buildings’ central air-donditioning for peak load shifting are proposed based on the demonstration project.Then
the structrure and optimal dispatch model of central air-conditioning for day-ahead peak load shifting are constructed with electric power compay’s minimum compensation fees
considering the constraint of adjustable stragies
dispatch total and signal capacity
and so on.Lastly
as Jiangsu Province demonstration project on non-productive air-conditioning for example
the dispatch schedule in different period is got with CPLEX optimal soft ware.