YAO Yang. Application Analysis of CB ATSE Device in Category I Load of Thermal Power Plant[J]. 2017, 38(5): 59-62. DOI: 10.3969/J.ISSN.2095-3429.2017.05.014.
CB级ATSE装置在火电厂Ⅰ类厂用负荷中的应用分析
摘要
某电厂风机油站电气控制系统有两路工作电源
配备了CB级ATSE装置
装置采用了"自投自复"的工作模式;在电源切换过程中
出现了设备供电中断的现象。针对此问题展开了分析和讨论
并提出了改进措施
希望能为其他火电厂类似的CB型ATSE装置的应用提供参考。
Abstract
The electric control system of fan oil station of a power plant has two working power supply
equipped with CB ATSE device
the device adopts the working mode of "automatically transfer and restore ";In the process of power switching
the power supply interruption occurred.This paper had analyzed and discussed the problem
and put for-ward some improvement measures
hoped to provide refer-ence for other similar CB ATSE in thermal power plants.