智能配用电装备与系统全国重点实验室(河北工业大学),天津,300401
纸质出版:2026
移动端阅览
岳大为, 李冰新, 柴园园, 等. 计及风电不确定性与尾部风险的孤岛微电网可靠性快速评估[J]. 电力系统保护与控制, 2026,54(20).
YUE Dawei, LI Bingxin, CHAI Yuanyuan, et al. Fast reliability assessment of islanded microgrids considering wind power uncertainty and tail risk[J]. Power System Protection and Control, 2026, 54(20).
岳大为, 李冰新, 柴园园, 等. 计及风电不确定性与尾部风险的孤岛微电网可靠性快速评估[J]. 电力系统保护与控制, 2026,54(20). DOI: 10.19783/j.cnki.pspc.260347.
YUE Dawei, LI Bingxin, CHAI Yuanyuan, et al. Fast reliability assessment of islanded microgrids considering wind power uncertainty and tail risk[J]. Power System Protection and Control, 2026, 54(20). DOI: 10.19783/j.cnki.pspc.260347.
针对传统可靠性评估难以兼顾不确定性刻画、尾部风险度量与计算效率的问题,提出尾部风险可靠性快速评估框架。首先,基于实测数据构造小时级容量因子序列,结合“月-时”划分与共形校准,建立有限样本风电条件椭球不确定集,刻画风电波动范围。其次,以直流最优潮流最小切负荷模型为核心,引入条件风险价值(conditional value-at-risk
CVaR)构造尾部风险指标,并提出FAST-CVaR近似策略减少最优潮流(optimal power flow
OPF)调用。进而设计卷积神经网络(convolutional neural network
CNN)分类-回归代理模型,识别样本级尾部风险状态并预测强度,聚合估计可靠性指标。最后,在改进的RTS-GMLC区域1孤岛微电网算例中进行验证。结果表明,FAST-CVaR将OPF调用次数由60 000次减少至400次;CNN代理模型对两类可靠性尾部风险指标的估计相对误差分别为0.21%和0.51%,样本评估时间由743.504 s降至19.523 s。所提方法能够在保持尾部风险指标精度的同时显著降低计算开销,可为孤岛微电网尾部风险快速评估提供参考。
To address the difficulty of balancing uncertainty representation
tail-risk evaluation
and computational efficiency in conventional reliability assessment
this paper develops a fast tail-risk reliability assessment framework. First
hourly capacity-factor series are constructed from measured data. By combining month-hour partitioning and conformal calibration
a conditional ellipsoidal uncertainty set for wind power under limited samples is established to characterize wind power fluctuations. Second
based on a DC optimal power flow (DC-OPF) minimum load shedding model
conditional value-at-risk (CVaR) is introduced to construct tail-risk indicators
and a FAST-CVaR approximation strategy is proposed to reduce the number of OPF evaluations. Furthermore
a convolutional neural network (CNN)-based classification-regression surrogate model is developed to identify sample-level tail-risk states and predict risk severity
enabling efficient estimation of reliability indicators through sample aggregation. Finally
the proposed method is validated on a modified RTS-GMLC Area 1 islanded microgrid. The results show that FAST-CVaR reduces the number of OPF evaluations from 60 000 to 400. The relative errors of the CNN surrogate model in estimating the two types of reliability tail-risk indicators are 0.21% and 0.51%
respectively
and the sample evaluation time is reduced from 743.504 s to 19.523 s. The proposed method can significantly reduce computational cost while maintaining the accuracy of tail-risk indicators
providing an effective approach for fast tail-risk reliability assessment of islanded microgrids.
ZHAO Siying, SHAO Changzheng, DING Jinfeng, et al. Unreliability tracing of power systems for identifying the most critical risk factors considering mixed uncertainties in wind power output[J]. Protection and Control of Modern Power Systems, 2024, 9(5): 96-111.
LI X, LIU Y, GUO L, et al. Data-driven based uncertainty set modeling method for microgrid robust optimization with correlated wind power[J]. CSEE Journal of Power and Energy Systems, 2022, 9(2): 420-432.
ZUO L, WANG S, FANG J, et al. A quantitative accommodation guaranteed robust scheduling method for renewable power system with dynamic uncertainty set[J]. IEEE Transactions on Sustainable Energy, 2026, 17(1): 130-142.
SUN X, HUI W, DONG X, et al. Evaluating the reliability of microgrids consisting of renewable energy sources using stochastic scheduling based on the data-driven uncertainty set[J]. Engineering Applications of Artificial Intelligence, 2024, 133.
LI K, DUAN P, XUE Q, et al. Enhancing reliability assessment in distributed generation networks: Incorporating dynamic correlation of wind-solar power output uncertainty[J]. Sustainable Energy, Grids and Networks, 2024, 39.
LI X, XIE K, SHAO C, et al. A sensitivity-based rolling operational reliability evaluation method following the changing available generation capacity of renewable energies[J]. IEEE Transactions on Power Systems, 2024, 40(1): 166-177.
PANDIT D, SAKET R K, BERA A, et al. Reliability analysis of power grids considering component failures of variable energy resources[J]. IEEE Transactions on Industry Applications, 2025, 61(6): 8748-8759.
ZHANG S, LIU W, WAN H, et al. Combing data-driven and model-driven methods for high proportion renewable energy distribution network reliability evaluation[J]. International Journal of Electrical Power Energy Systems, 2023, 149.
WAHEED A, LI J. A hybrid model for efficient reliability assessment of power systems[J]. Sustainable Energy, Grids and Networks, 2025, 102.
KAMRUZZAMAN M, BHUSAL N, BENIDRIS M. A convolutional neural network-based approach to composite power system reliability evaluation[J]. International Journal of Electrical Power Energy Systems, 2022, 135.
ZHANG Y, CHEN Z, DONG X, et al. Multi-source-data- driven microgrids reliability analysis via power supply chain using deep learning[J]. Reliability Engineering System Safety, 2025, 111.
MARQUES F, PAULO C. Universal distribution of the empirical coverage in split conformal prediction[J]. Statistics Probability Letters, 2025, 219.
ZHU J, XU Y, TAI N, et al. Day-ahead joint chance- constrained optimal scheduling for distribution networks using partial input convex neural networks[J]. IEEE Transactions on Smart Grid, 2026, 17(1): 375-387.
0
浏览量
0
下载量
0
CSCD
关联资源
相关文章
相关作者
相关机构
京公网安备11010802024621