HE Chuan, ZHOU You, LIU Xuan, et al. 考虑显式可靠性约束与燃气管存的气电联合配网分布鲁棒规划方法[J]. Power System Protection and Control, 2025, 45(10). DOI: 10.19783/j.cnki.pspc.241048.
integrated electricity-gas distribution systems (IEGDS) have developed rapidly
highlighting the necessity of their study. To address the challenges of multi-facility planning and reliability assessment in IEGDS with renewable energy integration
a distributionally robust optimization (DRO) planning model is proposed that incorporates explicit reliability constraints. Reliability is quantified using the system average interruption frequency index (SAIFI) and the expected energy not supplied (EENS)
for which an explicit reliability evaluation model is provided. Using Wasserstein distance
a DRO planning model is employed to address the stochastic nature of renewable energy and gas-electric loads. Case studies show that increasing facility types not only reduces total costs but also enhances system reliability and flexibility. Uncertainties in renewable generation and electricity/gas demand can lead to over a 60% increase in total costs. Additionally
higher reliability requirements further increase costs
but the resulting planning solutions are more valuable and informative for practical implementation.