郭宇航, 孙银锋, 梁栋. 基于风电场储能精准控制的风电柔直并网直流故障穿越[J]. 东北电力大学学报, 2025,45(1).
GUO Yuhang, SUN Yinfeng, LIANG Dong#br#
郭宇航, 孙银锋, 梁栋. 基于风电场储能精准控制的风电柔直并网直流故障穿越[J]. 东北电力大学学报, 2025,45(1). DOI: 10.19718/j.issn.1005-2992.2025-01-0045-09.
GUO Yuhang, SUN Yinfeng, LIANG Dong#br#
由于风机内部配置储能单元具有运行的灵活性和可控性等优点,因此在故障穿越方面得到广泛应用,但是在分析时未考虑储能单元的差异性可能造成系统在故障期间功率不平衡,危害系统安全稳定运行。针对以上问题,提出基于风电场储能精准控制的永久性直流故障穿越协调控制策略。首先,对风电经双极柔直并网系统的拓扑结构、储能控制策略及储能容量的配置进行说明:然后,考虑到双极柔直系统在单极退出时另外一极仍具备正常运行的能力,根据不平衡功率的大小将故障分为自消纳情形与非自消纳情形。自消纳情形下的不平衡功率均由非故障极传输。非自消纳情形下按照储能单元的荷电状态的不同,将不平衡功率精准分配给各个风机内部储能单元。在保证系统功率平衡的同时,缩小各储能单元的剩余容量的差异,考虑储能单元容量的限制采用分步切机的方法保证被切风机内部储能单元退出运行时系统功率仍然保持平衡;最后,在PSCAD/EMTDC仿真平台上搭建模型验证了文中所提故障穿越方案的有效性。
Because the scheme of energy storage unit inside the wind turbine has the advantages of flexibility and controllability
it is widely used in the field of fault ride through.However
the difference of energy storage unit is not considered in the previous analysis
which may cause power imbalance during the fault period and endanger the safe and stable operation of the system.To address this issue
a permanent DC fault ride-through coordinated control strategy based on precise control of wind farm energy storage is proposed.Firstly
the structure of the system
the energy storage control strategy
and the configuration of energy storage capacity are explained.Then
considering that one pole of the bipolar MMC-HVDC system still has the ability to operate normally when the other polar exits
the fault is divided into self-absorption and non-self-absorption cases according to the size of the unbalanced power.In the case of self-absorption
the unbalanced power is transferred to non-fault poles.In the case of non-self-absorption
the unbalanced power is precisely distributed to the internal energy storage units of the wind turbines based on the different State of Charge (SOC)levels.This ensures power balance in the system while reducing the differences between energy storage units.The capacity constraint of the energy storage units is addressed by the stepwise cut-off method
which ensures that the power balance is maintained when an internal energy storage unit is removed from operation.Finally
the effectiveness of the proposed fault ride-through scheme is verified through model simulation using the PSCAD/EMTDC platform.