WU Qirong, TAO Jianguo, FAN Baocheng, et al. Technical route selection and economic sensitivity analysis of large-scale carbon capture in coal-fired power plant[J]. Thermal power generation, 2022, 51(10): 28-34.
WU Qirong, TAO Jianguo, FAN Baocheng, et al. Technical route selection and economic sensitivity analysis of large-scale carbon capture in coal-fired power plant[J]. Thermal power generation, 2022, 51(10): 28-34. DOI: 10.19666/j.rlfd.202206112.
In order to study the feasibility of large-scale carbon capture devices in coal-fired power plants
the technical route and ecnomic sensitivity of carbon capture devices at home and abroad is systematically analyzed. It is concluded that
the improved chemical absorption carbon capture technology should be give priority to selecting in China at the present stage. When selecting absorbers
industrially proven improved compound amine absorbers should be used mainly
and spare measures for other absorbent systems should be appropriately considered in future.In terms of energy saving process selection
the input and output ratio should be considered and priority should be given to the mature economical processes such as flue gas precooling
inter-stage cooling
liquid separation and flash compression. The equipment purchase cost accounts for 83.8% of the investment cost
so the optimization and selection of key equipment should be focused on. The steam and electricity costs account for 72.8% of the operation cost
so low steam and electricity cost power plants should be given priority in the project construction. When the fluctuation range of sensitivity parameters is ±10%
the influences of investment cost
unit capture energy consumption
steam price
electricity price and absorbent unit price on the sensitivity of final comprehensive CO_2 capture cost are 6.2
12.4
12.5
8.3
2.0 yuan
respectively. The results show that steam price
energy consumption per unit CO_2 capture and electricity price are significant factors affecting the carbon capture cost. Then is the investment cost