HUANG Jiasi, LIU Yonglin, FU Yiwei, et al. Thermo-electricity decoupling capacity evaluation of steam bypass for a 200 MW power unit[J]. Thermal power generation, 2018, 47(10): 90-95.
HUANG Jiasi, LIU Yonglin, FU Yiwei, et al. Thermo-electricity decoupling capacity evaluation of steam bypass for a 200 MW power unit[J]. Thermal power generation, 2018, 47(10): 90-95. DOI: 10.19666/j.rlfd.201712159.
In order to solve the contradiction between the heating demand of the unit and the peak regulating of the power grid
three kinds of thermo-electricity decoupling schemes for operation mode
equipment reformation
and system structure are compared and analyzed. It is recommended to use the bypass scheme of main steam and reheat steam for thermo-electricity decoupling of steam bypass for the actual unit. At the same time
for the evaluation of the thermo-electricity decoupling scheme
the maximum heating capacity and the minimum electric load capacity of the unit are put forward as the quantitative evaluation index. The analytical results show that
after adopting the steam bypass decoupling scheme for a unit
the heating capacity increases by 119 MW and the minimum electric load decreases by 46 MW. When the steam bypass expansion scheme is adopted
the heating capacity increases by 180 MW and the minimum electric load decreases by 89 MW.