CHEN Nian-zhongNorst-west China Electric Power Construction and Debugging Research Institute. HOT-STATE WASHING OF AIR-COOLED CONDENSOR FOR 600 MW DIRECT AIR COOLED UNIT[J]. Thermal power generation, 2009, 38(2): 63-65.
CHEN Nian-zhongNorst-west China Electric Power Construction and Debugging Research Institute. HOT-STATE WASHING OF AIR-COOLED CONDENSOR FOR 600 MW DIRECT AIR COOLED UNIT[J]. Thermal power generation, 2009, 38(2): 63-65. DOI: 10.19666/j.rlfd.2009.02.017.
600MW直接空冷机组空冷凝汽器热态冲洗
摘要
对华电灵武发电厂600 MW直接空冷2号机组空冷凝汽器的热态冲洗过程进行分析
结果表明合理安排冲洗过程
可使空冷凝汽器热态冲洗用时短
效果明显
空冷凝汽器带负荷冲洗93.5 h后
凝结水精处理前铁含量为47μg/L
水质合格。
Abstract
The hot-state washing process has been analysed and summed up for air-cooled condenser of 600 MW direct air cooled unit no.2 in Huadian Lingwu Power Plant.Reasonable arrangement of the washing process can shorten the time duration of hot-state washing
having remarkable effectiveness
the iron content before condensate polishing treatment being 47 mg/L.