330MW汽轮机组优化运行试验研究
摘要
以国电石嘴山发电公司330MW汽轮机组的优化运行试验为基础
通过不同负荷下滑压运行的变工况试验分析
对机组的运行状况进行经济性比较
确定机组的最佳运行方式。优化运行后机组在300~200MW负荷间
综合折合热耗率降低了6.95~95.10kJ/(kW.h)。
Abstract
Taking optimization of operation for 330 MW steam turbine units in Guohua Shizuishan Power Generation Co Ltd as the test basis
through test
comparison
and analysis of the varying operating condition in sliding pressure operation under different loads of the units
the economic efficiency in operation of the units has been compared
and the optimal operation mode of units being determined.