CHEN Xiao-hong1, PING Heng1, HOU Bing21.Beijing Guohua Electric Power Co Ltd. STUDY ON ENVIRONMENTAL IMPACT POST EVALUATION FOR THERMAL POWER PLANT PROJECT[J]. Thermal power generation, 2008, (10): 1-5.
CHEN Xiao-hong1, PING Heng1, HOU Bing21.Beijing Guohua Electric Power Co Ltd. STUDY ON ENVIRONMENTAL IMPACT POST EVALUATION FOR THERMAL POWER PLANT PROJECT[J]. Thermal power generation, 2008, (10): 1-5. DOI: 10.19666/j.rlfd.2008.10.001.
火电厂项目环境影响后评价的研究
摘要
探讨了环境影响后评价在火电厂项目管理中的意义。通过分析火电厂的实际情况
建立环境影响后评价指标体系
并介绍了火电厂项目环境影响后评价的基本内容和方法。以某海滨电厂为例
利用隶属度模型确定了火电厂环境影响主要指标:水环境、噪声、供电煤耗等的隶属度
应用德尔菲法确定各评价指标的权重
最终采用多级模糊综合后评价的方法
对电厂环境影响进行了定性和定量的评价。
Abstract
Taking one seaside power plant as example
the main indices affecting environment by thermal power pant have been determined by using a menbership degree model
including menbership degree of water environment
noise
and coal consumption of power supply etc.
and the weights of each evaluation index being determined by applying Delphi method.Finally
by adopting multistage fuzzy comprehensive post evaluation method
the environmental impact of said power plant has been qualitatively and quantitatively evaluated.