CHEN Jian-xian, TAO Lei Guodian Beilun Power Plant. INSTALLATION OPTIMIZATION OF STEAM-DRIVEN FEED-WATER BOOSTER PUMP FOR ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal power generation, 2008, (9): 68-70.
CHEN Jian-xian, TAO Lei Guodian Beilun Power Plant. INSTALLATION OPTIMIZATION OF STEAM-DRIVEN FEED-WATER BOOSTER PUMP FOR ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal power generation, 2008, (9): 68-70. DOI: 10.19666/j.rlfd.2008.09.020.
The installed location of the steam-driven feed-water booster pump for ultra-supercritical 1 000 MW unit in Beilun Power Plant has been changed from elevation 0 m in the main machine hall onto 17 m operating floor
and the integrated mode deaerator being heigtened to 40.5 m
thereby
the economic efficiency in operation of unit being enhanced
the distribution condition of service power being improved
and the invested capital of equipments being reduced.This modification can provide reference for design and type selection of steam-driven feed-water booster pump used for similar type of unit.