CHEN Zuo-wen Huaneng Shantou Power Plant. CAUSES RESULTING IN EFFICIENCY-REDUCING OF ELECTROSTATIC PRECIPITATOR FOR 300 MW UNIT AND COUNTER MEASURES THEREOF[J]. Thermal power generation, 2008, (9): 56-58.
CHEN Zuo-wen Huaneng Shantou Power Plant. CAUSES RESULTING IN EFFICIENCY-REDUCING OF ELECTROSTATIC PRECIPITATOR FOR 300 MW UNIT AND COUNTER MEASURES THEREOF[J]. Thermal power generation, 2008, (9): 56-58. DOI: 10.19666/j.rlfd.2008.09.016.