FU Long-long1, LIU Chao1, LEI Zhao-tuan1, et al. START-UP DEBUGGING AND OPERATION OF PLASMA IGNITION SYSTEM FOR EXTRA-SUPERCRITICAL 1000 MW UNIT IN HUANENG YUHUAN POWER PLANT[J]. Thermal power generation, 2008, (4): 50-51.
FU Long-long1, LIU Chao1, LEI Zhao-tuan1, et al. START-UP DEBUGGING AND OPERATION OF PLASMA IGNITION SYSTEM FOR EXTRA-SUPERCRITICAL 1000 MW UNIT IN HUANENG YUHUAN POWER PLANT[J]. Thermal power generation, 2008, (4): 50-51. DOI: 10.19666/j.rlfd.2008.04.013.
超超临界1000MW机组等离子点火系统起动调试及运行
摘要
介绍了华能玉环电厂超超临界1000MW机组2号锅炉等离子点火系统起动调试及其运行情况。调试后
等离子点火系统运行正常、稳定
锅炉实现了冷态无油点火起动
仅起动调试阶段即可节约燃油约6000t
并使电除尘器得以尽早投入运行
节能降耗及环保效果显著。
Abstract
The start-up debugging process and operation situation of plasma ignition system for extra-supercritical 1000 MW unit in Huaneng Yuhuan Power Plant have been presented.After debugging
operation of the plasma ignition system is normal and stable
the cold-state oilless start-up of boiler being realized
the fuel oil being saved about 6 000 t only in the stage of start-up debugging
and the electrostatic precipitator may be put into operation as early as possible
having remarkable effectiveness of energy-saving and consumption-reducing.