QIN Chao-hui1, LI Xue-Zhong21.Nantong Power Plant under Huaneng International Electric Power Co Ltd. TRIAL OPERATION OF BOILER STARTINGUP FOR 600 MW SUPERCRITICAL UNIT IN QINBEI POWER PLANT[J]. Thermal power generation, 2007, (11): 37-41.
QIN Chao-hui1, LI Xue-Zhong21.Nantong Power Plant under Huaneng International Electric Power Co Ltd. TRIAL OPERATION OF BOILER STARTINGUP FOR 600 MW SUPERCRITICAL UNIT IN QINBEI POWER PLANT[J]. Thermal power generation, 2007, (11): 37-41. DOI: 10.19666/j.rlfd.2007.11.010.
The 2×600 MW units in Huaneng Qinbei Power Plant are the supercritical units adopting imported technology from abroad and manufactured at home for the first time. Through summing-up equipment layout of the units
commissioning operation
and the entire start-up process
the problems occurred in trial operation of the supercritical units have been systematically analysed
and measures and recommendations for solving said problems being put forward.