FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF
XU Xiao-chun1, SUN Ya-guang1, ZHU Dong-sheng1, et al. FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF[J]. Thermal power generation, 2007, (10): 48-51.
XU Xiao-chun1, SUN Ya-guang1, ZHU Dong-sheng1, et al. FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF[J]. Thermal power generation, 2007, (10): 48-51. DOI: 10.19666/j.rlfd.2007.10.014.
The 168 h trial operation of the first supercritical 600 MW turbo-generator set manufactured by Beizhong-Alstom Power Equipment Corporation had been successfully completed on 19th of March
2007
in Pingwei Power Generation Co Ltd no.2
having put into commercial trial operation.During the rotation-impulsing process of the first starting-up for the unit
trouble of excessive shafting system vibration had occurred.Through cause analysis of said trouble
corresponding measures had been taken
making the problem of shafting system vibration to be solved