国华台山电厂2号机组惰走时间延长的原因分析及处理
摘要
汽轮机的惰走时间是机组停运过程的重要监视参数
以国华台山电厂(台电)2号机组为例
分析了机组惰走时间延长的原因
介绍了消除惰走时间延长的措施及其结果。
Abstract
The idling time of steam turbine is one of the important supervisory parameters is shutdown process of the steam turbine set.Taking steam turbine no.2 in Guohua Taishan Power Plant as an example
the causes leading to prolonged idling time of the unit have been analysed
and measures for eliminating the prolonged idling time as well as their result being presented.