国电安顺电厂一期机组暖疏系统改造
摘要
对国电安顺电厂一期1号、2号机组锅炉暖疏系统暖疏泵故障频繁
影响系统正常运行
对暖疏系统进行了改造
取消暖疏泵
将暖疏水直接送入凝汽器。利用2号锅炉暖疏泵
设计加装了2号锅炉炉底加热系统
使2号锅炉冷态起动时间缩短
起动耗油量减少。
Abstract
Troubles of warming drain pumps in the warming drain system of boiler no.1 and boiler no.2 for units in the first-phase project of Guodian Anshun Power Plant have frequently occurred
affecting normal operation of the system.A retrofit of the warming drain system has been carried out
eliminating the warming drain pump
and the warming drain being directly fed into the condenser. Utilizing the warming drain pump of boiler no.2
a furnace bottom heating system for boiler no.2 has been designed and additionally installed
shortening the time used for cold-state start-up of boiler no.2