LI Hong-boXinjiang Huadian Hongyanchi Power Generation Co Ltd, Wulumqi 830047, Xinjiang Region. REMEDY OF TUBE-BURST IN SUSPENDED PIPING SYSTEM OF FRONT EMBRACING WALL IN THE REAR VERTICAL SHAFT OF 670 t/h BOILER[J]. Thermal power generation, 2007, (7): 85-88.
LI Hong-boXinjiang Huadian Hongyanchi Power Generation Co Ltd, Wulumqi 830047, Xinjiang Region. REMEDY OF TUBE-BURST IN SUSPENDED PIPING SYSTEM OF FRONT EMBRACING WALL IN THE REAR VERTICAL SHAFT OF 670 t/h BOILER[J]. Thermal power generation, 2007, (7): 85-88. DOI: 10.19666/j.rlfd.2007.07.025.
The ring-type transverse breakage or burst crack has successively occurred in suspended piping system at A side on the front embracing wall in rear vertical shaft of the 670 t/h boiler of Hudian Hongyanchi Power Generation Co Ltd during trial operation.It is believed from analysis that the main cause is due to the restraint stress at A side of the suspended piping system being abnormally large
and the greater residual stress of welding newly installed finned tubes on the boiler.For this
preventive measures have been taken for stress-eliminating treatment