LI Peng-ju(Pingwei Power Generation Co Ltd. DISPOSAL OF ABNORMAL PROBLEM FOR HP-ROTOR'S SHRINKAGE MOVEMENT IN TURBINE NO.1 OF DAYABAY NUCLEAR POWER STATION[J]. Thermal power generation, 2007, (4): 69-70.
LI Peng-ju(Pingwei Power Generation Co Ltd. DISPOSAL OF ABNORMAL PROBLEM FOR HP-ROTOR'S SHRINKAGE MOVEMENT IN TURBINE NO.1 OF DAYABAY NUCLEAR POWER STATION[J]. Thermal power generation, 2007, (4): 69-70. DOI: 10.19666/j.rlfd.2007.04.018.
大亚湾核电站1号机高压转子收缩窜动量异常问题的处理
摘要
D110大修(1号机第十轮大修)时通过对高压缸进行全面解体检修时发现
解体时测得收缩窜动量小于设计值0.75 mm。通过有关的测量、检查、分析后
结合轴向通流间隙变化情况
决定将高压缸向后(2号轴承方向)推0.5 mm。从大修后机组的起动及运行情况来看
有效地解决了1号机高压转子收缩窜动量异常问题
确保了机组的顺利起动和安全可靠运行。
Abstract
It had been discovered through overall inspection of HP cylinder in the tenth major repair of turbine no.1 at Dayabay Nuclear Power Station that the shrinkage movement measured during dis-assemblage was less than the designed value of 0.75 mm.After related measurement
inspection
and analysis
combined with variated clearance of the axial flow passage
it is determined to push the HP cylinder backward(to direction of bearing no.2) for 0.5 mm.From situation of start-up and operation after said major repair
it can be seen that the abnormal shrinkage movement problem of HP rotor for turbine no.1 has effectively been solved
ensuring smooth start-up
as well as safe and reliable operation of the unit.