LI Lu-jiang, LI Hui, LIANG Hua(Hebei Electric Power Research Institute. OPTIMIZED IMPROVEMENT DESIGN OF THE DRAIN SYSTEM FOR HOME-MADE 150 MW STEAM TURBINE[J]. Thermal power generation, 2007, (4): 65-68.
LI Lu-jiang, LI Hui, LIANG Hua(Hebei Electric Power Research Institute. OPTIMIZED IMPROVEMENT DESIGN OF THE DRAIN SYSTEM FOR HOME-MADE 150 MW STEAM TURBINE[J]. Thermal power generation, 2007, (4): 65-68. DOI: 10.19666/j.rlfd.2007.04.017.
国产150MW汽轮机疏水系统优化改进设计
摘要
针对国产150 MW汽轮机疏水系统在设计上存在的若干问题进行了探讨。提出改进疏水系统的措施
缩短了机组起动时间
提高了机组参与调峰运行的能力
改善了机组运行的安全性和经济性。
Abstract
Directing against several problems existing in the design of drain system for home-made 150 MW steam turbine
an approach has been made
the measures for improving said drain system being put forward
obtaining better result
shortening start-up duration of the unit
enhancing capability of the unit to participitate into peak-regulating operation
improving safety and economic behavior of the unit in operation.