OPTIMIZATION OF THE RUN BACK FUNCTION OF UNITS IN SECOND-PHASE PROJECT OF HUANENG FUZHOU POWER PLANT[J]. Thermal power generation, 2006, (6): 37-39. DOI: 10.19666/j.rlfd.2006.06.012.
华能福州电厂二期机组RB功能优化
摘要
介绍了华能福州电厂二期2×350 MW机组RB功能存在的问题及其解决方案
实施后RB动作基本成功。
Abstract
The problems existing in run back(RB) function of 2×350 MW units in secondphase project of Huaneng Fuzhou Power Plant
as well as solution schemes thereof have been presented.