WU Quan. DESIGN,ERRECTION,AND COMMISION DEBUGGING OF 600MW DIRECT AIR-COOLED UNIT PROJECT IN GUODIAN DATONG POWER-GENERATION CO LTD[J]. Thermal power generation, 2006, (6): 29-31.
WU Quan. DESIGN,ERRECTION,AND COMMISION DEBUGGING OF 600MW DIRECT AIR-COOLED UNIT PROJECT IN GUODIAN DATONG POWER-GENERATION CO LTD[J]. Thermal power generation, 2006, (6): 29-31. DOI: 10.19666/j.rlfd.2006.06.009.
国电大同发电厂600MW直接空冷机组设计、安装和调试运行
摘要
阐述国内第一台600 MW机组直接空冷系统的选型、设计思路及其原则
介绍安装和调试工作的经验
并给出了相关建议。
Abstract
The type selection
design thinking
and principle of aircooled system for the first 600 MW unit at home have been expounded
the experience of errection and debugging being presented