Directing against the features and problems existing in operation of air and water jointly operated slag cooler
such as difficult slag discharge
high temperature of outlet slag
serious wornout of the air cap and inner wearresisting material etc..for circulating fluidized bed(CFB) boiler no.1 of 2×135 MW units in one power plant
the improvement measures have been put forward after analysis
and having been implemented in design and debugging of the slag cooler of boiler no.2.After improvement
very good result has been obtained
realizing continuous slag discharge
making comprehensive performance of the slag cooler to be enhanced.