DEBUGGING AND RETROFITTING OF THERMAL CONTROL SYSTEM FOR 600 MW SUPERCRITICAL UNITS IN HUANENG QINBEI POWER PLANT[J]. Thermal power generation, 2005, (12): 83-85.
DEBUGGING AND RETROFITTING OF THERMAL CONTROL SYSTEM FOR 600 MW SUPERCRITICAL UNITS IN HUANENG QINBEI POWER PLANT[J]. Thermal power generation, 2005, (12): 83-85. DOI: 10.19666/j.rlfd.2005.12.027.
华能沁北电厂600MW超临界机组热控系统调试与改进
摘要
介绍了华能沁北电厂国产超临界600MW机组热控系统设计与调试情况
对存在的问题进行了改进
改进后系统工作正常
效果较好。
Abstract
The design and debugging situation of thermal control system for homemade supercritical 600MW units in Huaneng Qinbei power plant has been presented. Directing against existing problems
retrofit had been carried out. After retrofitting
the said control system becomes in normal operation