国产超临界机组起动调试的特点及主要问题的分析处理
摘要
介绍了华能沁北电厂国产化首期600MW超临界机组系统设计、性能及辅机配置
较系统地阐述了该型机组起动调试的特点
并对调试过程中出现的主要问题和处理过程进行了分析讨论。
Abstract
The system design
performance
and auxiliary equipments allocation of first homemade 600 MW supercritical units in Huaneng Qinbei Power Plant have been presented
the features of commission debugging for said units being systematically expounded
and the main problems occurred in the process of debugging and their treatment course being analysed and discussed.