ZENG Deyoug, HE Yudong. TRAIN OF THOUGHT FOR PRELIMINARY DESIGN OF CHIMNEYCOOLING TOWER INTEGRATED PROJECTS IN OUR COUNTRY[J]. Thermal power generation, 2005, (9): 1-4.
ZENG Deyoug, HE Yudong. TRAIN OF THOUGHT FOR PRELIMINARY DESIGN OF CHIMNEYCOOLING TOWER INTEGRATED PROJECTS IN OUR COUNTRY[J]. Thermal power generation, 2005, (9): 1-4. DOI: 10.19666/j.rlfd.2005.09.001.
国内烟塔合一工程初步设计思路
摘要
介绍国内某电厂烟塔合一工程的初步设计思路。结合德国一些电厂的经验
对循环水量、烟塔及烟道的设计进行了论述
认为国内电厂采用烟塔合一方案时应因地制宜
不可照搬国外设计。
Abstract
Train of thought for preliminary design of chimneycooling tower integrated projects in our country has been presented. Combined with experiences of some thermal power plants is Germany
the design of circulatingwater flow rate
chimneycooling tower
and flue gas passage has been expounded. It is believed that the integrated scheme of chimney and cooling tower should be adopted in line with local conditions. and the designs in foreign countries can’t be indiscriminately imitated.