HE Rong-qiang, ZHU Ming-piao, XIE Xiao-qiang. RETROFITTING LARGE-SCALE BOILER FOR DARK START-UP AND REALIZATION THEREOF[J]. Thermal power generation, 2005, (3): 28-29.
HE Rong-qiang, ZHU Ming-piao, XIE Xiao-qiang. RETROFITTING LARGE-SCALE BOILER FOR DARK START-UP AND REALIZATION THEREOF[J]. Thermal power generation, 2005, (3): 28-29. DOI: 10.19666/j.rlfd.2005.03.009.
大型锅炉黑起动改造与实现
摘要
介绍了300 MW机组锅炉黑起动改造与实施的情况。此改造充分利用现有的设备
在大型锅炉上实现直接黑起动操作
免除了小型起动锅炉大量的、无意义的维护工作
缩短了电厂生产恢复的时间和节约了机组起动能耗
保证电厂在遇到极端恶劣的情况下顺利恢复运行
对电厂的安全生产有实际意义。
Abstract
The situation of retrofitting 300MW large-scale power plant for dark start-up has been presented.In above-mentioned retrofitting
the dark start-up operation has been directly realized on large-scale boiler by fully utilizing the existing equipments
aveiding vast amount of maintenance work without significance for staring -up small boilers
saving time for restoring production of the power plant and energy consumption of the units
ensuring the power plant to successfully restore operation under extremely adverse circumstances
having important significance for safe production of the power plant.