LU Lidong. NEW FLUSHING METHODS FOR STEAM-WATER SYSTEM OF NEWLY CONSTRUCTED UNITS[J]. Thermal power generation, 2004, (11): 76-77. DOI: 10.19666/j.rlfd.2004.11.027.
新建机组汽水系统冲洗的新方法
摘要
介绍新建机组投运前高压加热器汽侧和疏水管道蒸汽吹扫、冲洗方法及给水再循环系统的冲洗方法。实践表明
这两种冲洗方法效果明显
机组在升负荷时
基本未受到汽水中硅含量超标的影响
也很少因杂物造成滤网堵塞
汽水品质合格快
缩短了低负荷运行时间
节约了燃油。此外
这两种方法简单易行
成本很低
Abstract
The steam blowing and flushing methods for steam side of highpressure heaters and drain pipeline
as well as flushing method for feedwater recirculating system before putting into operation of newly constructed units have been presented. The practice shows that the effectiveness of the two said methods to be obvious
during the time of increasing load of the unit
the influence of overlimited silicon content in steam and water having not appeared
the clogging of strainer resulting from foreign matters being also seldom occurred
quickening the speed of qualification for steamwater qualtiy