LI Bin. ANALYSIS OF RAPID START-UP AND THERMAL ECONOMIC PERFORMANCE FOR 330MW UNITS MANUFACTURED BY BEI-ZHONG STEAMTURBINE CO LTD[J]. Thermal power generation, 2004, (8): 1-3.
LI Bin. ANALYSIS OF RAPID START-UP AND THERMAL ECONOMIC PERFORMANCE FOR 330MW UNITS MANUFACTURED BY BEI-ZHONG STEAMTURBINE CO LTD[J]. Thermal power generation, 2004, (8): 1-3. DOI: 10.19666/j.rlfd.2004.08.001.
北重330MW机组快速起动和经济性能分析
摘要
根据北京北重汽轮机有限责任公司生产的 330MW汽轮机结构和运行特点
详细分析了其起动和经济性能
总结了该型汽轮机起动速度快及经济性能优良的主要因素。
Abstract
Based on structure and operational features of 330MW steamturbine manufactured by Bei-Zhong Steamturbine Co Ltd
the rapid start-up and economic performance of said steamturbine have been analysed in detail
the main reasons resulting in rapid start-up and good economic performance being sammaried.