YANG Xiang- hang. TEST AND STUDY ON TUBE-WALL OVER-TEMPERATURE PROBLEM DURING THE START-UP COURSE OF PULVERIZING MILLS[J]. Thermal power generation, 2003, (12): 16-18.
YANG Xiang- hang. TEST AND STUDY ON TUBE-WALL OVER-TEMPERATURE PROBLEM DURING THE START-UP COURSE OF PULVERIZING MILLS[J]. Thermal power generation, 2003, (12): 16-18. DOI: 10.19666/j.rlfd.2003.12.006.
The tests and study results for tube - wall over - temperature problem during the start - up course of pulverizing mills on boiler No. 1 hi Rizhou Power Plant
Shandong Province
have been presented. The causes leading to tube - wall over - temperature of reheater and superheater during the start - up course of reheater and superheater during the start - up course of pulverizing mills being analysed
and concrete measures for solving the said problem being put forward. The test results have certain guiding significance for solving the tube - wall over - temperature problems exsisting widely during the start - up course of pulverizing mills for wall - type combustion boilers.