ZHUANG Xu-kui. DCS INTEGRATING RETROFIT OF ETS SYSTEM FOR UNIT NO.3 IN ZHUJIANG POWER PLANT OF GUANGZHOU CITY[J]. Thermal power generation, 2003, (10): 70-72.
ZHUANG Xu-kui. DCS INTEGRATING RETROFIT OF ETS SYSTEM FOR UNIT NO.3 IN ZHUJIANG POWER PLANT OF GUANGZHOU CITY[J]. Thermal power generation, 2003, (10): 70-72. DOI: 10.19666/j.rlfd.2003.10.023.
广州珠江电厂3号机组ETS系统的DCS一体化改造
摘要
广州珠江电厂对 3号机组进行DCS一体化改造
并将ETS也纳入了DCS改造范围。介绍了 3号机组改造后ETS的系统组成
电控系统各设备功能及特性
ETS电控系统所实现的功能及方式
DCS一体化改造后ETS系统的优缺点
Abstract
DCS integrating retrofit of unit NO.3 has been carried out in the title power plant
the ETS system having also been brought into the scope of DCS retrofitting. The composition of ETS system after said retrofitting
the function and performance of various equipments in the electric control system
the functions and mode realized by the ETS electric control system
as well as strong and weak points of ETS system after DCS integrating retrofit have also been described in this paper.