In view of troublesome problems of high exhaust gas temperature and high hot air temperature having existed after putting two CG-130/3.82-M12 type boilers into operation at Yili Thermal Power Plant NO.2
corresponding retrofitting schemes have been studied and worked out
namely renewing 107m 2 area of superheater in the boiler
increasing heating surface area of a party of the economizer
adding 8 steam soot-blowers in the heat recovery gas duct. The operation after retrofitting shows
the exhaust gas temperature having been lowered by 30℃