扼要介绍石横发电厂国产引进型 30 0MW 3号汽轮机组投产以来的运行情况和设备及系统存在的问题
并阐述了 3号汽轮机组的完善改进措施和实施技术改进后的实际效果。通过完善改进
机组热耗率相对下降 333.4 5kJ/(kW·h)
发电煤耗率下降 1 2 .5 g/(kW·h)
改造效果显著。
Abstract
The operational situation and troublesome problems existing in equipment and system for home-made 300MW turbine unit No.3 of imported type after putting into operation at Shihong Power Plant have been briefly described
and the retrofitting measures for perfection of said unit and practical results after implementation of technical retroffitting being expounded. Through said retroffitting
the specific heat consumption has been relatively reduced by 333.45 kJ/(kWh)
specific coal consumption for electric energy generation by 12.5 g/(kWh)