RETROFIT OF STEAM TURBINE FOR CAPACITY-UPGRADING AND EFFICIENCY-ENHANCING IN THERMAL POWER PLANT UNDER QILU PETRO-CHEMICAL CORP[J]. Thermal power generation, 2003, (6): 47-49.
RETROFIT OF STEAM TURBINE FOR CAPACITY-UPGRADING AND EFFICIENCY-ENHANCING IN THERMAL POWER PLANT UNDER QILU PETRO-CHEMICAL CORP[J]. Thermal power generation, 2003, (6): 47-49. DOI: 10.19666/j.rlfd.2003.06.015.
齐鲁石化公司热电厂汽轮机增容增效改造
摘要
阐述了齐鲁石化公司热电厂 6号汽轮机组增容增效的改造方案
以及改造前、后的效果分析。通过对改造前、后性能试验结果的分析认为
对汽轮机本体的改造是成功的。针对机组在热力系统和冷端系统方面存在的问题
提出了需要进一步完善的建议
Abstract
The retrofitting scheme of steam turbine No.6 in thermal power plant under Qilu Petro-Chemical Corp for capacity-upgrading and efficiency-enhancing
as well as analysis of effectiveness before and after retroffitting have been expounded. Through analysis of performance tests’ results before and after retrofitting
it is considered that the retrofit of steam turbine proper is succeessful
despite the fact that further improvement is still needed in aspects of thermodynamic system and cold end system. Some related recommodations are also given for troublesome problems existing still on the said units.