WANG Gang. OPERATION PERFORMANCE ANALYSIS AND MEASURES TAKEN FOR IMPROVING SOOT BLOWERS ON BOILERS NO.5 AND 6 AT JINGYUAN POWER PLANT[J]. Thermal power generation, 2003, (3): 44-46.
WANG Gang. OPERATION PERFORMANCE ANALYSIS AND MEASURES TAKEN FOR IMPROVING SOOT BLOWERS ON BOILERS NO.5 AND 6 AT JINGYUAN POWER PLANT[J]. Thermal power generation, 2003, (3): 44-46. DOI: 10.19666/j.rlfd.2003.03.014.
靖远电厂5、6号炉吹灰器运行情况分析及处理措施
摘要
靖远电厂 5、6号炉吹灰器使用中发生了多次吹损水冷壁和吹爆省煤器管的现象
分析认为IR 3D型炉膛吹灰器在炉膛不结焦的情况下
完全可以停用。同时
要正确使用长杆吹灰器
制定一个最佳吹扫周期
并且应加强对吹灰器的运行维护和管理。
Abstract
In application of soot blowers on boilers NO.5 and 6 at Jingyuan Power Plant
phenomena of blowing damage on water walls and tube-bursting on the economizers have occurred many times. Through analysis
it is considered that the IR-3D type soot blowers can be completely stopped under condition without slagging occurred in the furnace. At the same time
in order to correctly use the long-stem soot blowers
an optimal blowing cycle should be formulated
and operational maintenance and management of the soot blowers must be strengthened.