HE Jian-kang. COMPARISION OF THERMAL CONTROL'S DEBUGGING AND MANAGING METHODS FOR DOMESTIC THERMAL AND NUCLEAR POWER PLANTS[J]. Thermal power generation, 2002, (6): 5-7.
HE Jian-kang. COMPARISION OF THERMAL CONTROL'S DEBUGGING AND MANAGING METHODS FOR DOMESTIC THERMAL AND NUCLEAR POWER PLANTS[J]. Thermal power generation, 2002, (6): 5-7. DOI: 10.19666/j.rlfd.2002.06.002.
我国火电厂与核电站热控调试管理方法比较
摘要
介绍了我国常规火电厂与岭澳核电站在自动控制和仪表方面的调试及管理方法
分析了它们之间的共同点与不同之处
并对各自的特点进行了比较
提出了在调试中引进质量管理的概念
Abstract
The debugging and managing methods in sectors of automatic control and instruments at domestic thermal power plants and Ling'ao Nuclear Power Station are presented
the common and different points between them are analysed. Then; a suggestion of introducing quality control into the process of debugging is made.