TEST OF THE RUNBACK FUNCTION IN A THERMAL POWER PLANT[J]. Thermal power generation, 2002, (5): 67-69. DOI: 10.19666/j.rlfd.2002.05.022.
火力发电厂RUNBACK功能试验
摘要
在宝鸡第二发电公司 3号机组RUNBACK性能试验的基础上
通过对试验数据的整理、分析
阐述RUNBACK性能试验的基本原理、逻辑功能的完善和改进
可为电厂运行及RUNBACK性能试验提供参考
Abstract
Based on the RUNBACK performance test on unit No.3 in Baoji Second Power Generation Co.Ltd
the fundamental principle of RUNBACK performance test as well as perfection and improvement of the logical function have been expounded via collation and analysis of the test data
providing with valuable reference for plant operation and RUNBACK performance test in the future.