LI Yi-jie. PERFORMANCE ANALYSIS, IMPROVEMENT AND COMMISSIONING OF THE COORDINATED CONTROL SYSTEM BETWEEN STEAM TURBUNE AND BOILER AT HUANENG SHANTOU POWER PLANT[J]. Thermal power generation, 2001, (6): 41-44.
LI Yi-jie. PERFORMANCE ANALYSIS, IMPROVEMENT AND COMMISSIONING OF THE COORDINATED CONTROL SYSTEM BETWEEN STEAM TURBUNE AND BOILER AT HUANENG SHANTOU POWER PLANT[J]. Thermal power generation, 2001, (6): 41-44. DOI: 10.19666/j.rlfd.2001.06.011.
华能汕头电厂机炉协调控制系统性能分析、改进及调试投运
摘要
简要介绍了华能汕头电厂机炉协调控制系统的设计、性能和响应特点
并详细阐述了其技术改进方案和试验情况
对改进后的系统性能及投用后调节响应特点进行了评价。
Abstract
The design
performance and response features of the title control system have been briefly stated. The technical improvement scheme and test aspects of the said control system have been elaborated
and the performance of said control system after retrofitting
as well as the features of control response after putting the said system into operation are evaluated.