ANALYSIS ON BULLDING GAS-STEAM COMBINED CYCLE POWER PLANT FOR OPTIMIZING THE POWER SOURCE STRUCTURE[J]. Thermal power generation, 2001, (2): 9-11. DOI: 10.19666/j.rlfd.2001.02.003.
对河南省建设燃气-蒸汽联合循环电站优化电源结构的分析
摘要
根据河南省电力发展现状及电力系统存在的主要问题
分析了建设燃气 -蒸汽联合循环电站的可能性及必要性
并对燃气 -蒸汽联合循环电站、抽水蓄能电站、国产脱硫燃煤电厂、国产不脱硫燃煤电厂进行了技术经济比较
Abstract
The status quo of power industry development in Henan Province and main problems existing in the power system are described
the possibility and necessity of building gas-steam combined cycle power plant are analyzed
a technic and economic comparison of gas-steam combined cycle power plant with pumped storage station
domestic desulferized and non-desulferized coal-fired power plants is given as well.