台州电厂300MW汽轮机组是北重—阿尔斯通合作生产的汽轮发电机组,其设计是在任何工况下均为中压缸启动方式。高低压旁路装置选用苏尔寿设备,容量分别为机组额定负荷的70%、40%。中压调节阀可以参与汽轮机转速与负荷旁路装量的并联运行,提高了机组自动化水平的可靠性。
Abstract The 330MW turbine unit of Taizhou Power Station
manufactured by Beijing Heavy Electric Machine Works with Alsthom technology
was designed to start up by steam emission through IP turbine under all conditions.The HP and LP bypass systems were provided by Sulzer
with 70% and 40% of rated capacity respectively.The IP regulation valve can work in parallel with the bypass system to control speed and load
thus improving the reliabiltiy of automatic control of turbin unit.