大亚湾核电站2号机组在启动和带负荷试运行期间,振动超过GEC公司合同的保证值,后经过现场一系列测试,并对测试结果进行了分析,提出了处理意见。实施后使振动问题得以解决。
During initial startup and trial operation with load
unit No.2 of Daya Bay nuclear power Plant operated with a vibration higher than the GEC guaranteed value.With a number of tests and analysis
measures to deal with the vibration wereproposed.And the vibration problen was solved after their complementation.