Jian Wang,Ning Xie,Chunyi Huang,Yong Wang.Two-stage stochastic-robust model for the self-scheduling problem of an aggregator participating in energy and reserve markets[J].Protection and Control of Modern Power Systems,2023(03).
Bo Zeng,Long Zhao.Solving two-stage robust optimization problems using a column-and-constraint generation method[J].Operations Research Letters,2013.