Zehao Shi, Jiajia Chen, Yanxin Wang, 等. Credibility Copula-Based Robust Multistage Plan for Industrial Parks Under Exogenous and Endogenous Uncertainties[J]. 中国电机工程学会电力与能源系统学报(英文), 2025,11(3):987-998.
Zehao Shi, Jiajia Chen, Yanxin Wang, et al. Credibility Copula-Based Robust Multistage Plan for Industrial Parks Under Exogenous and Endogenous Uncertainties[J]. CSEE Journal of Power and Energy Systems, 2025, 11(3): 987-998.
Zehao Shi, Jiajia Chen, Yanxin Wang, 等. Credibility Copula-Based Robust Multistage Plan for Industrial Parks Under Exogenous and Endogenous Uncertainties[J]. 中国电机工程学会电力与能源系统学报(英文), 2025,11(3):987-998. DOI: 10.17775/CSEEJPES.2024.09120.
Zehao Shi, Jiajia Chen, Yanxin Wang, et al. Credibility Copula-Based Robust Multistage Plan for Industrial Parks Under Exogenous and Endogenous Uncertainties[J]. CSEE Journal of Power and Energy Systems, 2025, 11(3): 987-998. DOI: 10.17775/CSEEJPES.2024.09120.
Credibility Copula-Based Robust Multistage Plan for Industrial Parks Under Exogenous and Endogenous Uncertainties
The integration of photovoltaic and energy storage in industrial parks enhances economic benefits. However
uncertainties in photovoltaic output and future electricity prices pose challenges to optimal configuration. To address these issues
this paper develops a credibility copula-based robust multistage plan. Firstly
it addresses endogenous uncertainties in electricity pricing and exogenous uncertainties in photovoltaic output. Meanwhile
the copula function is used to couple endogenous uncertainties of the time-of-use
on-grid and demand power prices. Secondly
based on credibility theory
a fuzzy chance constraint model of endogenous uncertainties of future electricity prices and exogenous uncertainties of the PV output is derived. Finally
the method transforms fuzzy chance constraints into deterministic robust optimization through clear equivalence classes. Simulation analyses using data from an industrial park validate the applicability and effectiveness of the proposed approach.