Yunfei Mu, Congshan Wang, Mingshen Wang, 等. Risk-averse Planning and Evaluation for Park-level Integrated Energy System Considering Seasonal Correlation of Uncertain Energy Prices[J]. 中国电机工程学会电力与能源系统学报(英文), 2026,12(5):2555-2568.
Yunfei Mu, Congshan Wang, Mingshen Wang, et al. Risk-averse Planning and Evaluation for Park-level Integrated Energy System Considering Seasonal Correlation of Uncertain Energy Prices[J]. CSEE Journal of Power and Energy Systems, 2026, 12(5): 2555-2568.
Yunfei Mu, Congshan Wang, Mingshen Wang, 等. Risk-averse Planning and Evaluation for Park-level Integrated Energy System Considering Seasonal Correlation of Uncertain Energy Prices[J]. 中国电机工程学会电力与能源系统学报(英文), 2026,12(5):2555-2568.DOI: 10.17775/CSEEJPES.2022.08330.
Yunfei Mu, Congshan Wang, Mingshen Wang, et al. Risk-averse Planning and Evaluation for Park-level Integrated Energy System Considering Seasonal Correlation of Uncertain Energy Prices[J]. CSEE Journal of Power and Energy Systems, 2026, 12(5): 2555-2568.DOI: 10.17775/CSEEJPES.2022.08330.
Risk-averse Planning and Evaluation for Park-level Integrated Energy System Considering Seasonal Correlation of Uncertain Energy Prices
摘要
Abstract
Due to the liberalization of energy markets
energy prices are volatile and plagued with strong uncertainties. In this context
park-level integrated energy system (PIES) planning is confronted with potential cost variation risks caused by uncertain energy prices and does not know the strength of planning results to resist risks. This paper proposes a risk-averse planning and evaluation method for PIESs considering uncertainties in natural gas price (NGP) and electricity price (EP). Based on the seasonal variation characteristics and correlation between NGP and EP
the dynamic conditional correlation (DCC) model and copula theory are used to formulate a seasonal joint probability distribution of NGPs and EPs for price scenario generation. Then
conditional value-at-risk (CVaR) is introduced to quantify the risk of cost variation
and a CVaR-based planning model that considers uncertainties of energy prices is developed. Under the generated joint price scenarios
the planning schemes at different confidence levels are determined by minimizing the CVaR of the total cost (including investment
fuel
and maintenance costs). By introducing a margin of safety ratio (MSR) index
the risk-averse ability to uncertain energy prices of the planning scheme is evaluated to support decision-making. Finally
a case study is conducted to validate the effectiveness of the proposed planning method.
关键词
Keywords
references
4. U.S. Energy Information Administration. (2022, Jan.). Wholesale electricity prices trended higher in 2021 due to increasing natural gas prices. [Online]. Available: https://www.eia.gov/todayinenergy/detail.php?id=50798#:~:text=Growing%20fuel%20costs%20in%202021%20resulted%20in%20increased.hub%20in%20California%20CAISO%20market%20%28a%2037%25%20increase%29
9. (2021, Oct.). Which UK energy companies have gone bust? [Online]. Available: https://www.inyourarea.co.uk/news/which-uk-energy-companies-have-gone-bust/