Shenghu Li, Huijie Zhao, Diwen Tao, 等. Reliability Evaluation and Sensitivity Analysis for UHVDC-HC Considering Preventive Maintenance and Inverter Capacity Levels[J]. 中国电机工程学会电力与能源系统学报(英文), 2025,11(5):2514-2524.
Shenghu Li, Huijie Zhao, Diwen Tao, et al. Reliability Evaluation and Sensitivity Analysis for UHVDC-HC Considering Preventive Maintenance and Inverter Capacity Levels[J]. CSEE Journal of Power and Energy Systems, 2025, 11(5): 2514-2524.
Shenghu Li, Huijie Zhao, Diwen Tao, 等. Reliability Evaluation and Sensitivity Analysis for UHVDC-HC Considering Preventive Maintenance and Inverter Capacity Levels[J]. 中国电机工程学会电力与能源系统学报(英文), 2025,11(5):2514-2524.DOI: 10.17775/CSEEJPES.2021.07820.
Shenghu Li, Huijie Zhao, Diwen Tao, et al. Reliability Evaluation and Sensitivity Analysis for UHVDC-HC Considering Preventive Maintenance and Inverter Capacity Levels[J]. CSEE Journal of Power and Energy Systems, 2025, 11(5): 2514-2524.DOI: 10.17775/CSEEJPES.2021.07820.
Reliability Evaluation and Sensitivity Analysis for UHVDC-HC Considering Preventive Maintenance and Inverter Capacity Levels
Preventive maintenance (PM) enhances the reliability of an ultra-high-voltage DC (UHVDC) line. However
it introduces new states and complicates the task of determining the reliability parameters of the component with PM. The hierarchical connection (HC) of the inverter improves the flexibility of UHVDC
but the state spaces of the inverter and UHVDC-HC are determined by capacity distribution between the high terminal (HT) and low terminal (LT)
which has not been studied yet. In this paper
the reliability of UHVDC-HC with the PM is studied. First
with the impact of PM described by a nonlinear coefficient
the state space of the components with PM is aggregated. It is the same size as without PM. The only difference is the transition rate. Second
considering power distribution between the HT/LT and its dependence on the state of the rectifier
new capacity levels of HT/LT
e.g.
75%/2
50%/3
are defined. Third
with capacity levels of the HT/LT differentiated
2 existing reliability indices are extended
and 2 are newly defined. Finally
a sensitivity model of the reliability of the UHVDC-HC to its parameters and the PM period is proposed.