Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching
Regular Papers|更新时间:2026-10-15
|
Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching
Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching
中国电机工程学会电力与能源系统学报(英文)2023年9卷第3期 页码:1103-1118
作者机构:
1. School of Electrical and Electronic Engineering, North China Electric Power University,Beijing,China
2. State Grid Shaoxing Power Supply Company,Shaoxing,China
Ran Tao, Dongmei Zhao, Haoxiang Wang, 等. Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching[J]. 中国电机工程学会电力与能源系统学报(英文), 2023,9(3):1103-1118.
Ran Tao, Dongmei Zhao, Haoxiang Wang, et al. Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching[J]. CSEE Journal of Power and Energy Systems, 2023, 9(3): 1103-1118.
Ran Tao, Dongmei Zhao, Haoxiang Wang, 等. Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching[J]. 中国电机工程学会电力与能源系统学报(英文), 2023,9(3):1103-1118.DOI: 10.17775/CSEEJPES.2021.05510.
Ran Tao, Dongmei Zhao, Haoxiang Wang, et al. Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching[J]. CSEE Journal of Power and Energy Systems, 2023, 9(3): 1103-1118.DOI: 10.17775/CSEEJPES.2021.05510.
Multi-stage Defender-Attacker-Defender Model for Distribution System Resilience Enhancement in Ice Storms with Line Hardening, Mobile Device and Repair Crew Dispatching
This paper proposes a co-optimal strategy using line hardening
mobile devices (mobile ice-melting device
mobile emergency generator
mobile energy storage system)
and repair crew dispatching to improve distribution system resilience during ice storms. A multi-stage defender-attacker-defender model is established to take into account interactions and coupling relationships between different measures. In our proposed model
ice storms will attack the distribution and transportation system in a worst-case scenario
affecting system performance from various perspectives. Corresponding to the different operating states in the distribution system affected by ice storms
aiming at minimizing the weighted load shedding value
this paper applies various measures to different stages to improve the response and defense capabilities to ice storms and realize restoration of the distribution system ultimately. The nested column-and-constraint generation algorithm is used to solve the model efficiently. The effectiveness of the proposed model and solution method for enhancing the distribution system resilience is verified on the modified IEEE 33-bus distribution system and modified real-world zone of Caracas 141-bus distribution system.